Tover's architecture and engineering

Thursday, September 27, 2012

Pre-cal Bridge

Bridge with grid with a 1-1.5 ratio
Posted by Unknown at 9:13 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Wednesday, September 26, 2012

My Bridge

My bridge design
Posted by Unknown at 10:34 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

arrow

top view of the arrow
Posted by Unknown at 10:33 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ►  2013 (1)
    • ►  January (1)
  • ▼  2012 (20)
    • ►  November (5)
    • ►  October (12)
    • ▼  September (3)
      • Pre-cal Bridge
      • My Bridge
      • arrow

About Me

Unknown
View my complete profile
Awesome Inc. theme. Powered by Blogger.