Tover's architecture and engineering
Wednesday, November 14, 2012
Pics of setting final bridge and putting it together/scores
Aesthetics score was a 2.29
and the weight it carried was only 140 lbs much lower then my original bridge
setting the bridge
putting it together was difficult
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment